ᐱᓇᓱᐊᑦᓴᐅᑉ ᐊᑎᖓ /

Project to Implement a Contaminated Soil Treatment Centre in Salluit

Project to Implement a Contaminated Soil Treatment Centre in Salluit
ᑫᓪᓗᐊᑎ /
Kativik Regional Government
ᐅᓪᓗ ᐃᓱᒪᒋᔭᐅᔪᖅ ᓴᓇᓂᕐᒥᒃ ᐱᒋᐊᕐᕕᐅᓛᕐᑎᓗᒍ /
2027-2028
ᓄᓇᓕᖓ /
Salluit
ᓇᔪᕐᑕᐅᔪᖅ /
The proposed site is located approximately 500 metres north of the village’s northern landfill, outside the village’s residential and commercial core, along a road that leads to wastewater treatment ponds

ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ

The project is located in the Northern Village of Salluit, on Category I lands

ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /

ᐱᓇᓱᐊᑦᓴᐅᑉ ᒪᓂᔭᐅᓂᖓ
ᐱᐅᓂᖓᑕ ᑲᒪᒍᑕᐅᓂᖓ
ᑐᑭᑖᕐᓂᖅ ᐊᒻᒪᓗ ᐊᖏᕐᓂᖅ

ᐅᓕᕐᓀᕈᑎᖓ

Certificate of Exemption

ᐅᓕᕐᓀᕈᑎᖓ pdf 163 KB

ᐅᓕᕐᓀᕈᑎᖓ

The project involves building a local centre for the biopile treatment of contaminated soils, to treat such soils directly on site. Its capacity will be around 1,000 m3 of contaminated soil. Centre facilities will include a contaminated soil storage area and a treated soil area, each measuring 225 m2.

A container will be set up for contaminated snow in the event of an accidental spill. The project will allow for the storage and management of hydrocarbon-contaminated snow, as well as the treatment of contaminated water from snow melt.

Project activities include:
– Removing bulky items from the site
– Building an access road
– Site levelling, if required
– Importing backfill, if required
– Installing geomembranes and drainage
– Installing aeration, water and air treatment systems
– Connecting the system to the power grid
It will be possible to hook the facilities up to the power grid without having to extend existing infrastructures. At end of use, the infrastructure will be dismantled and disposed of off-site. Process water retention basins will be removed and the ground levelled. Soil characterization will be carried out before and after the project to assess this latter’s impact.