Project to Mine the Inukshuk Deposit and Increase Ore Processing Plant Capacity at the Expo Industrial Complex
ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ
ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /
ᐅᓕᕐᓀᕈᑎᖓ
Authorization of the Modification of the Certificate of Authorization
ᐅᓕᕐᓀᕈᑎᖓ pdf 2 MBᐅᓕᕐᓀᕈᑎᖓ
The infrastructure to be developed at the Inukshuk site are:
– An access portal to the underground mine
– Secondary access roads
– A temporary ore dump
– A temporary waste rock stockpile
– A mine water catchment basin (MCB)
– A powder keg
– Three platforms
– A service station with a 50,000-L-oil tank
– An administrative building and a sanitary block
– A communications tower
– Two ventilation shafts and an emergency exit out of the underground mine
The proponent is also requesting an increase in the ore processing rate at the Expo complex concentrator from 4,500 t/day to 4,808 t/day.