ᐱᓇᓱᐊᑦᓴᐅᑉ ᐊᑎᖓ /

Project to Implement a Contaminated Soil Treatment Centre in Kangiqsujuaq

Project to Implement a Contaminated Soil Treatment Centre in Kangiqsujuaq
ᑫᓪᓗᐊᑎ /
Kativik Regional Government
ᐅᓪᓗ ᐃᓱᒪᒋᔭᐅᔪᖅ ᓴᓇᓂᕐᒥᒃ ᐱᒋᐊᕐᕕᐅᓛᕐᑎᓗᒍ /
2027-2028
ᓄᓇᓕᖓ /
Kangiqsualujjuaq
ᓇᔪᕐᑕᐅᔪᖅ /
The proposed site is located approximately 150 metres north of the village’s northern landfill

ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ

The project is located in the Northern Village of Kangiqsujuaq, on Category I lands

ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /

ᐱᓇᓱᐊᑦᓴᐅᑉ ᒪᓂᔭᐅᓂᖓ
ᐱᐅᓂᖓᑕ ᑲᒪᒍᑕᐅᓂᖓ
ᑐᑭᑖᕐᓂᖅ ᐊᒻᒪᓗ ᐊᖏᕐᓂᖅ

ᐅᓕᕐᓀᕈᑎᖓ

ᐅᓕᕐᓀᕈᑎᖓ

The project involves building a local centre for the biopile treatment of contaminated soils to treat such soils directly on site. Its capacity is slated to be around 1,000 m3 of contaminated soil. Centre facilities will include a contaminated soil storage area and a treated soil area, each measuring 225 m2.

A container will be set up for contaminated snow in the event of an accidental spill. The project will allow for the storage and management of hydrocarbon-contaminated snow, as well as the treatment of contaminated water from snow melt.

Project activities include:
– Site levelling, if required
– Importing backfill, if required
– Building an access road
– Installing geomembranes and drainage
– Installing aeration, water and air treatment systems

ᐊᓪᓚᓯᒪᔪᐃᑦ ᕿᒥᕐᕈᔭᐅᒍᓐᓇᑐᑦ