Name of the project /

In Situ Treatment of Petroleum Hydrocarbon-Contaminated Soil in Tasiujaq

In Situ Treatment of Petroleum Hydrocarbon-Contaminated Soil in Tasiujaq
Proponent /
FCNQ Construction Inc.
Expected date of construction /
2025
Community /
Tasiujaq
Location /
Residual contamination of around 15 m3 under the concrete slab at the boundary of the Petro and mechanical garages

Affected area

The project is located in the Northern Village of Tasiujaq, on Category I lands

Step of the procedure /

Project submission
Evaluation
Decision and authorization

Decision

Certificate of Exemption

Decision pdf 152 KB

Description

Following an accidental diesel spill at the Tasiujaq Petro garage on February 8, 2024, environmental remediation work was carried out in 2024. However, there is still residual contamination of around 15 m3 under the concrete slab at the boundary of the Petro and mechanical garages.

The chosen treatment consists of two series of soil injections using a surfactant and/or biological oxidant via injection wells excavated with core drills and excavators

Documents available for consultation