Name of the project
Marine infrastructures maintenance work
Proponent
Kativik Regional Government
Expected date of construction
Summer 2015
Community
Kuujjuaq
Step of the procedure
- Project submission
- Evaluation
- Preparation of impact study
- Review and public participation
- Decision and authorization
Decision
The Commission has decided to authorize the project under certain conditions.
Description
The accumulated sediments in the basin will be removed using an excavator and transported to a designated deposit site with a dump truck. Work will be done at low tide while the basin is water-free.
Calendar
The work will be conducted during the summer of 2015.